Vol 30 No 3 (2024)
Published: 2024-03-08
Articles
A review of agent-based modeling in construction management: an analytical framework based on multiple objectives
Abstract 1135 | PDF Downloads 561 | DOI https://doi.org/10.3846/jcem.2024.20949
Page 200–219
Adaptive LOB scheduling for optimizing resource leveling and consumption
Abstract 820 | PDF Downloads 357 | DOI https://doi.org/10.3846/jcem.2024.20952
Page 220–233
MIVES multi-criteria framework to sustainability index of design for manufacture and assembly
Abstract 816 | PDF Downloads 360 | DOI https://doi.org/10.3846/jcem.2024.20953
Page 234–247
Analysis of visual impact by new building height through UAVs and photogrammetry
Abstract 655 | PDF Downloads 226 | DOI https://doi.org/10.3846/jcem.2024.20957
Page 248–263
Back analysis and stability prediction of surrounding rock during excavation of the Shuangjiangkou underground powerhouse
Abstract 683 | PDF Downloads 251 | DOI https://doi.org/10.3846/jcem.2024.20778
Page 264–278
Risk assessment of subway station fire by using a Bayesian network-based scenario evolution model
Abstract 929 | PDF Downloads 365 | DOI https://doi.org/10.3846/jcem.2024.20846
Page 279–294