1.
Błaszczyk T, Nowak M. The time‐cost trade‐off analysis in construction project using computer simulation and interactive procedure. TEDE [Internet]. 2009Dec.31 [cited 2024Nov.26];15(4):523-39. Available from: https://jeelm.vgtu.lt/index.php/TEDE/article/view/6469